contact

Trigg Co., KY

Lakebarkley021517 156
Lakebarkley021517 037 %282%29
Replaces arch
Img 0225
File5
Img 0405
Arrow left
1 of 6
Arrow right
Date: 2017

Owner: Kentucky Transportation Cabinet (KYTC)

General Contractor: PCL Civil

Bid Type: Traditional Bid-Build

Brief Summary: For this project, Stupp Bridge Company fabricated approximately 6,900 tons of steel for the US68/KY80 bridge over Lake Barkley. The bridge’s plate girder spans, supplied by Stupp Bridge, total over 3000 feet in length. The plate girders are over 8’ deep and utilized 50W steel that was fully primed in the shop.

Weight: 6900 Tons